Vestindien ThermaSteel Project
STX / Judith’s Fancy
Contractor: Peter Sites

Day 1:
Panels Arrive in Container and Labeled for Assembly.



Exterior Panels are Attached to Cement Pad

Interior Panels are Added

Hurricane Panels

End of Day 1-First Floor Framed-in

Days 2 & 3:
Tighten First Floor Joints and Second Floor Sub-flooring Installed

Day 4:
Second Floor Panels Erected

End of Day 4-Ready for Roof

Island Style Beam & Batten Roof/Ceiling

Roughed-in with Scratch Coat Elastameric Applied

Finished Front
ProcServlet (params=[pa=0.5&sa=0&ry=400&rx=600&cr=0.0,0.0,1.0,1.0&nocredit=1&ci=47b8dd03b3127cce985489fc69a800000027100AZMmLRwzbsWOg&r=0&cb=16777215&p=1&ps=1&po=0&g=2.2&bw=0.2&b=1&ph=65535&si=00101738412220080322210226620.JPG&gc=1&vtype=g] actions=[Cached

Ready for Landscaping Back
ProcServlet (params=[pa=0.5&sa=0&ry=400&rx=600&cr=0.0,0.0,1.0,1.0&nocredit=1&ci=47b8dd03b3127cce985489e7e88300000027100AZMmLRwzbsWOg&r=0&cb=16711679&p=1&ps=1&po=0&g=2.2&bw=0.2&b=1&ph=65534&si=00101738412220080322210229654.JPG&gc=1&vtype=g] actions=[Cached

Some Interior Views










Sun on the Balcony



A Fine View in Paradise